Project Overview
Tanjong Malim Hi-Tech Industrial Park is a 447-acre industrial development by Setia Awan, located near Proton City and the Automotive Hi-Tech Valley. Designed for manufacturers and technology-driven businesses, the development offers flexible industrial land configurations with room for future expansion.
Phase 1 Industrial Land
Phase 1 covers 104 acres and comprises 14 industrial plots, with lot sizes starting from 5 acres and above. The illustrated plots range from approximately 5.47 to 6.83 acres, offering options for businesses with different operational and development requirements.
Strategic Location Near Proton City
Situated along the Behrang–Tanjong Malim Highway and adjacent to Proton City, the industrial park places businesses close to an established automotive manufacturing ecosystem. Its location supports connections with manufacturers, suppliers and supporting industries within the surrounding industrial corridor.
Highway and Logistics Connectivity
The development offers access to the North–South Expressway via nearby toll interchanges. Approximate distances include 8 km to Behrang Toll, 9 km to Tanjong Malim Toll and 9 km to KTM cargo services. Kuala Lumpur city centre is approximately 84 km away, Port Klang is 110 km away and Kuala Lumpur International Airport is 130 km away.
Industrial Infrastructure and Utilities
The brochure outlines a centralised water reservoir, external main drainage system, centralised sewerage treatment plant, water and sewerage reticulation, and telecommunications manholes and ducting. Utility providers listed include TNB for electricity, Gas Malaysia for natural gas, Lembaga Air Perak for water and MCMC-licensed telecommunications operators.
Road Access for Industrial Operations
The planned road network features a 100-foot-wide main access road with four lanes and 66-foot-wide secondary roads with two lanes. These roads are designed to support vehicle movement and access throughout the industrial park.
Flexible Development and Built-to-Suit Options
Flexible land configurations and scalable plot sizes support different business requirements and phased expansion. Built-to-suit development solutions are also outlined, allowing businesses to explore customised facilities suited to their operational needs.
Investment and Business Setup Support
The development offers support with investment approvals, manufacturing licences, infrastructure coordination and development planning. Eligible investors may explore incentives such as Pioneer Status, Investment Tax Allowance and stamp duty or import duty exemptions, subject to application, eligibility and government approval.
Enquire About Tanjong Malim Hi-Tech Industrial Park
Contact Megaharta for the latest plot availability, pricing and project details, or to arrange a discussion about your industrial property requirements.